Unibep to build biomass plant for Orlen in Poland

Green Forum
Unibep has signed a contract with Orlen Termika for the construction of a biomass boiler house at the Pruszków combined heat and power (CHP) plant. 

The contract is worth approximately €46.1 million.

The contract covers the construction of a complete, new biomass boiler house equipped with three identical boiler units, each with a capacity not exceeding 14.9 MWt, along with auxiliary systems and installations. 

The investment also includes the integration of the new boiler house into the existing infrastructure of the Pruszków CHP plant. The project is scheduled for completion in the fourth quarter of 2027.

RECOMMENDED
Orlen secures €1.8 billion for grid upgrade
Energy

Orlen secures €1.8 billion for grid upgrade

Polish energy group Orlen announced that its subsidiary, Energa Operator, has secured a €1.8bn loan to modernize the power grid, preparing it for the integration of renewable energy sources.

RECOMMENDED FROM THE HOME PAGE
Energy

10 simple ways to reduce energy use at home

Improving energy efficiency in buildings plays a key role in building a sustainable future. It leads to lower costs, a healthier indoor environment, and a smaller environmental footprint. According to România Eficientă, efficient energy use is not about sacrificing comfort but about eliminating waste.

READ MORE
Green Forum  |  14 August, 2025 at 3:11 AM