CMS advised DRI on PPAs with OMV Petrom
CMS has provided legal counsel to DRI in relation to the physical power purchase agreements (PPAs) concluded with OMV Petrom for three solar projects.
CMS has provided legal counsel to DRI in relation to the physical power purchase agreements (PPAs) concluded with OMV Petrom for three solar projects.
DRI, the EU renewables arm of Ukrainian energy company DTEK, announced plans to develop a 120 MW wind farm in Croatia.
DRI, the European renewables division of Ukrainian energy company DTEK, has successfully connected its 60MW Glodeni II solar park to the Romanian grid.
DRI, the EU renewable energy division of Ukrainian energy company DTEK, has appointed Ivan Geliukh as its new CEO, succeeding John Stuart, who led the company for nearly three years.
European companies are facing widespread challenges as they attempt to comply with the EU's new sustainability reporting standards, according to recent findings from the European Financial Reporting Advisory Group (EFRAG).
Improving energy efficiency in buildings plays a key role in building a sustainable future. It leads to lower costs, a healthier indoor environment, and a smaller environmental footprint. According to România Eficientă, efficient energy use is not about sacrificing comfort but about eliminating waste.
The European Ombudsman has formally questioned the European Commission's handling of recent proposals aimed at scaling back corporate sustainability requirements, raising concerns over transparency and procedural compliance.
Hidroelectrica has selected Waldevar Energy to implement the Nufărul Project, a pioneering renewable energy initiative set to become the largest floating photovoltaic (FPV) system installed on a hydroelectric dam in Europe.
Met Group has inaugurated Hungary's largest standalone battery energy storage system (BESS), a 40 MW / 80 MWh facility located at the Dunamenti Power Station in Százhalombatta.