First wind power plant projects to appear in the Black Sea
The first wind power projects could be installed in the Black Sea in 2027-2028, said the Minister of Energy, Sebastian Burduja.
The first wind power projects could be installed in the Black Sea in 2027-2028, said the Minister of Energy, Sebastian Burduja.
Hidroelectrica signed a joint venture agreement with Masdar from the United Arab Emirates, for the construction of offshore wind farms and floating solar farms in Romania. Hidroelectrica is the largest producer of green energy in Romania, with a portfolio of 187 hydropower plants, with a hydropower capacity of 6.3 GW, plus the Crucea wind farm, with an installed capacity of 108 MW.
Solar power has rapidly risen to become Hungary's second-largest source of electricity, overtaking gas for the first time in 2024.
Poland has moved up 49 places in the Climate Risk Index 2025, underscoring the increasing impact of climate change on the real estate sector. Heatwaves, heavy rainfall, droughts and floods are becoming a regular challenge for property owners and investors, according to Cushman & Wakefield.
European companies are facing widespread challenges as they attempt to comply with the EU's new sustainability reporting standards, according to recent findings from the European Financial Reporting Advisory Group (EFRAG).
Hidroelectrica has selected Waldevar Energy to implement the Nufărul Project, a pioneering renewable energy initiative set to become the largest floating photovoltaic (FPV) system installed on a hydroelectric dam in Europe.
Improving energy efficiency in buildings plays a key role in building a sustainable future. It leads to lower costs, a healthier indoor environment, and a smaller environmental footprint. According to România Eficientă, efficient energy use is not about sacrificing comfort but about eliminating waste.