CATL starts battery plant production in Hungary in 2025
CATL announced that its battery plant in Debrecen, Hungary, will begin production in 2025 as scheduled.
CATL announced that its battery plant in Debrecen, Hungary, will begin production in 2025 as scheduled.
Lockheed Martin and Romanian company Sinteza have signed a letter of intent to build a €50 million GridStar Flow battery factory in Oradea.
European companies are facing widespread challenges as they attempt to comply with the EU's new sustainability reporting standards, according to recent findings from the European Financial Reporting Advisory Group (EFRAG).
Improving energy efficiency in buildings plays a key role in building a sustainable future. It leads to lower costs, a healthier indoor environment, and a smaller environmental footprint. According to România Eficientă, efficient energy use is not about sacrificing comfort but about eliminating waste.
The European Ombudsman has formally questioned the European Commission's handling of recent proposals aimed at scaling back corporate sustainability requirements, raising concerns over transparency and procedural compliance.
Hidroelectrica has selected Waldevar Energy to implement the Nufărul Project, a pioneering renewable energy initiative set to become the largest floating photovoltaic (FPV) system installed on a hydroelectric dam in Europe.
Met Group has inaugurated Hungary's largest standalone battery energy storage system (BESS), a 40 MW / 80 MWh facility located at the Dunamenti Power Station in Százhalombatta.