The schools in Vrancea will be equipped with photovoltaic panels. The Minister of Investments and European Projects, Marcel Boloș, and the President of the Vrancea County Council, Cătălin Toma, signed the contract worth a total of €1.2 million for the production of green energy in the county. The contract will finance the project "Investments in electricity production capacities for own consumption at the level of Vrancea County". The project is financed by the Large Infrastructure Operational Program 2014-2020.
European companies are facing widespread challenges as they attempt to comply with the EU's new sustainability reporting standards, according to recent findings from the European Financial Reporting Advisory Group (EFRAG).
Improving energy efficiency in buildings plays a key role in building a sustainable future. It leads to lower costs, a healthier indoor environment, and a smaller environmental footprint. According to România Eficientă, efficient energy use is not about sacrificing comfort but about eliminating waste.
The European Ombudsman has formally questioned the European Commission's handling of recent proposals aimed at scaling back corporate sustainability requirements, raising concerns over transparency and procedural compliance.
Hidroelectrica has selected Waldevar Energy to implement the Nufărul Project, a pioneering renewable energy initiative set to become the largest floating photovoltaic (FPV) system installed on a hydroelectric dam in Europe.
Met Group has inaugurated Hungary's largest standalone battery energy storage system (BESS), a 40 MW / 80 MWh facility located at the Dunamenti Power Station in Százhalombatta.